Friday 1 April 2011

Targets set for April - May

1 Build the meat hooks, rail and rail fixings.
2 Get all sound imported and set up all triggers.
3 Build old metal rusty bed frame to block of  the other access to secound floor.
4 Build stainless steel cooking appliances, splash back and hood / extractor.
5 Build door frame and door for walk in freezer in kitchen area.
6 Build chest freezer for the kitchen area.
7 Build a Co2 Fire Exstinguisher for the kitchen area.
8 Build Fire Blanket and sign for kitchen area.
9 Build Exit sign for kitchen and main front hallway.
10 Build Kitchen fluorescent lights.